Introduction to the Event:
Reliability of structures is of utmost importance, as
the failure of structural system cannot be tolerated. It is very essential for
the site engineer to get the feel of concrete materials and concrete by
continuous checks on workability, cohesiveness, finished surface and most
importantly on strength. In this event we expect the concrete to achieve maximum
strength to satisfy the modern day needs like high rise buildings, long span
bridges, use of thinner compact members in construction etc. This event is for
the young engineers to acquire the art of designing concrete mixes.
Permissible ingredients of the concrete:
1.
Cement: a) OPC b) PPC
2.
Sand
3.
Khadi (Aggregates)
4.
Water
5.
Admixtures
6.
Plasticizers
7.
Cementatious material etc.
(Please specify all the materials which are used)
· No fibers are allowed
· No steel materials are
allowed
Strength of the concrete:
The compressive strength of the cube after 7
days should be 70 Mpa.
Dimensions of the cube:
The dimensions of the
cube should be 150mm x 150mm x 150mm.
Judging Criteria:
1.
As per IS standards the cubes will be tested at the age
of 7 days.
2. The primary judging criteria will be the average
compressive strength of the 3 cubes.
3. The secondary judging criteria will be the cost or the
economy.
4. Only Pond curing is allowed(at room temp.). Steam curing or accelerated curing or any other curing is not allowed.
5. Winning criteria will be decided as per the following :
- Average strength of three cubes should be 70Mpa.
- Variation of compressive strength of the three cubes should be minimum.
- In case of a tie, cement content will be considered.
- Teams have to submit design procedure i.e. concrete mix design with all details of quantities of materials used (Aggregates, cement,admixtures etc. ).
5. Date of testing will be displayed by
suitable means and will be put up on web-site.
5. Worksheet is expected with each entry. The worksheet
should be certified by the HOD of the Civil Department of the respective
college.
Rules:
1.
A team should consist of maximum 2 participants.
2.
Participants cannot submit more than 1 entry.
3.
From a college more than 1 team can participate.
4. Last date of registration is 24th Sept.,2008.
5. Date of testing will be displayed by
suitable means and will be put up on web-site.
6. Date of casting should be 24th/25th Sept.,2008
and should be prescribed on the worksheet certified by the H.O.D.
7. The testing will be conducted in the Concrete Technology
lab of College of Engineering, Pune.
8.
Decision of the judges will be final.
* If any of the constraints or
rules is not followed the entry will be disqualified.